Hurricane Irene Power Restoration
In August 2011 Hurricane Irene blasted the east coast of the United States with high winds and torrential rain. Allteck sent 26 powerline technicians to assist with the power restoration effort.
Read MoreWe are a leading provider of specialized contracting services and deliver end-to-end high voltage solutions for the electric power industry. We provide a comprehensive range of services which include the design, installation, maintenance and repair of all types of high voltage infrastructure.
In August 2011 Hurricane Irene blasted the east coast of the United States with high winds and torrential rain. Allteck sent 26 powerline technicians to assist with the power restoration effort.
Read MoreAltalink system planners have determined the need to increase the Wainwright substation capacity. Having built a solid track record in substation construction, Allteck has been awarded the contract.
Read More
